Location New Brunswick, Canada
Products Lead, silver doré, sulphuric acid
Employees 430
Annual production capacity

The Brunswick smelter has an annual capacity of 110,000 tonnes/year of refined lead and 450 tonnes/year of silver doré.  The smelter also produces over 100,000 tonnes/year of sulphuric acid.

 

Description of Operation

Brunswick smelter employs traditional sinter and blast furnace technology to process lead-silver concentrates and a wide range of recycled materials.  The facility also operates a lead-acid battery recycle plant and the bulk-handling port terminal for importing and exporting concentrates and other materials..

Brief History of the Operation

The smelter first opened in 1966 as a lead and zinc facility and was later modified to a lead-only facility with capability to treat lead-silver concentrates and a range of recycled materials.  The bulk-handling and battery-breaker facilities were commissioned in 1996.  The growth in custom smelting prompted the addition of a new blast furnace in 1999 and a silver refinery in 2000.